AlphaNIST: Binary Reward Plus Control Cost Hits 98.2% Sim Success

Loading video
Loading videoFirst post of the AlphaNIST thread: binary reward plus a control cost reaches 98.2% simulation success across 20 NIST assembly tasks, with no dense reward engineering.
Category: arm
Author: @octi_zhang
Date: 2026-10-13T00:00:00
Duration: 92.74s
Reference: https://arxiv.org/abs/2610.13354





